We are re-developing a project site with an existing Verizon utility pole. The proposed building and site features require the Verizon utility pole to be relocated with in the project site area. What do we need to do to have the pole relocated? Is there a form or process that needs completed? Do we need to reach out to someone to have a pole relocated?